2024-06-14 14:52:05
The tunnel for the A12 near Ade took two years to complete. Project was started in 2014 and completed in October 2016. The road closure for the final install of the structure took 48 hours. [Link] NEEDS_MORE_RATINGS(3-1-3) Author
2024-06-14 14:59:37
The post compares a massive infrastructure delivery in the space of a day or two with a far less complex repair which takes longer. The point is valid. Discussion should happen in the comments. NNN. NEEDS_MORE_RATINGS(3-0-1) Author